time:2021-08-20 09:21:27Views:
铂莱娱乐场Lianyungang Lingdong Electromechanical Equipment Co., Ltd. is a manufacturer of gas-liquid two-phase flow and electric auxiliary equipment such as continuous discharge expansion vessels. The agreement is applicable to the self-adjusting liquid level controller of the gas-liquid two-phase flow of the N125 continuous discharge expansion vessel in a thermal power plant. It proposes technical requirements in terms of energy and experimentation. This agreement proposes minimum technical requirements, and the supplier provides gas-liquid two-phase flow manufacturing and corresponding services that comply with the requirements of this agreement and industrial standards. If the demand party has any special requirements other than this agreement, they shall be proposed in writing and agreed upon by both the supply and demand parties. This technical agreement, as an attachment to the purchase contract, has the same legal force as the main text of the contract.
2. Design parameters
2.1 It is a self regulating liquid level controller for continuous discharge of gas-liquid two-phase flow
铂莱娱乐场Hydrophobic capacity: 6t/h
Hydrophobic temperature; 170 ℃
铂莱娱乐场Positive pressure: 0.6~0.8MPa
铂莱娱乐场(Steam side pressure below -: 0.2MPa)
Drain pipe diameter: Ф 89 mm
2.2 The second continuous discharge uses a steam liquid two-phase flow self regulating liquid level controller
铂莱娱乐场Hydrophobic capacity: 6t/h
Hydrophobic temperature; 110 ℃
Positive pressure: 0.2~0.3MPa
铂莱娱乐场(Steam side pressure below -: 0.05MPa)
Drain pipe diameter: Ф 89 mm
3. Specifications and standards for gas-liquid two-phase flow in equipment
The supplier shall design and manufacture according to the standards of gas-liquid two-phase flow and industry standards.
4. Technical requirements for gas-liquid two-phase flow
4.1 The continuous drainage flow rate can be fully automatically adjusted within the range of 6t/h ± 50%.
4.2 Spray nozzle material: 1Cr18Ni9Ti
5. Other requirements for gas-liquid two-phase flow
铂莱娱乐场5.1 All gas-liquid two-phase flow outer surfaces should be treated with appropriate methods and painted. The primer should be applied before the equipment rusts, and the surface paint should be applied after the primer is dry.
5.2 Transportation and storage measures for gas-liquid two-phase flow
铂莱娱乐场The gas-liquid two-phase flow must be completely dry during transportation, and all openings and flange interfaces must be protected to prevent damage, corrosion, or entry of impurities.
6. Supply scope of gas-liquid two-phase flow
Item Name Model Specification Unit Quantity Remarks
铂莱娱乐场1. Self regulating liquid level controller
(Supporting signal regulator) SWQ-IV (80) units 2
铂莱娱乐场(Equipped with interface counter flanges and fasteners)
2 Self regulating liquid level controller
(Supporting signal regulator) SWQ-IV (80) units 2
铂莱娱乐场(Equipped with interface counter flanges and fasteners)
The steam seal heater adopts a horizontal U-shaped surface heat exchan...
The steam seal cooler generally adopts a horizontal U-shaped surface h...
铂莱娱乐场The air cooler adopts finned tube material, single metal finned tube a...
The waste heat recovery device, also known as the energy collector and...
The U-shaped tube is used as a cooling tube for heat exchange tubes, a...
Overview of condenser tube replacement and condenser stainless steel t...
Welded steel pipes (also known as slotted pipes and welded pipes) are ...
铂莱娱乐场Welded steel pipes (also known as slotted pipes and welded pipes) are ...
铂莱娱乐场Manufacturer of shaft seal heaters, also undertaking pipe replacement ...
Welded steel pipes (also known as slotted pipes and welded pipes) are ...
Steam turbine oil-water cooler pipe replacement, marine oil-water cool...
When purchasing a column type oil cooler for tube and core replacement...
铂莱娱乐场The automatic steam liquid two-phase flow steam trap, also known as th...
铂莱娱乐场The oil injectors produced by Lianyungang Lingdong Electromechanical E...
The oil injector is composed of a nozzle, a filter screen, an expansio...
铂莱娱乐场A steam injector is a device that is powered by steam and is needed in...
Calculation of cooling area of sampling cooler 1: If the sample flow r...
铂莱娱乐场The sampling of fly ash sampler is selected on the flue between the ou...
The use of carbon steel material in coal powder samplers has caused ma...
The working status of the oil injector and main oil pump, the analysis...
The oil supply and lubrication oil injectors are completely identical ...
The installation and operation of the coal powder sampler and mobile c...
The manual mobile coal powder sampler produced and manufactured by Lia...
The oil injector of Lianyungang Lingdong Electromechanical Equipment C...
Vapor-liquid two-phase flow is used in continuous sewage expansion vessel铂莱娱乐场生产厂家Copyright © 2012-2023 Lianyungang Lingdong Electromechanical Equipment Co., Ltd all rights reserved